This project stabilized the Balligomingo Road and Brandywine Creek Road to address the slope failure now and for the future, this project involves slope stabilization, drainage improvements, pavement repair and replacement work. Construction activities involves the installation of a soldier pile retaining wall along the toe of the failed slope areas to stabilize the embankment slope and roadway rock protection and other miscellaneous construction.